HP Staal

Projects

Pipes

Building project, The Hague

HP Staal supplied long pipes with lengths exceeding 25 metres for contractor Vink Bouw in The Hague to reinforce the steel building basin. We also supplied several steel girders for the underpinning.

Delivered

4x steel pipes 25.10m (810 x 15/16mm)
2x steel girders 25.18m (HEB 400)
2x steel girders 21.05m (HEB 900)

Principal

Pipes

Building project, The Hague

HP Staal supplied long pipes with lengths exceeding 25 metres for contractor Vink Bouw in The Hague to reinforce the steel building basin. We also supplied several steel girders for the underpinning.

Delivered

4x steel pipes 25.10m (810 x 15/16mm)
2x steel girders 25.18m (HEB 400)
2x steel girders 21.05m (HEB 900)

Principal

Call or mail us for a tender

Call or mail us for a tender